Bathroom – week 2…
I’m slowly getting on with the work in the bathroom. The walls are plastered and the partition around the soil stack has been taken down and rebuilt about 25mm further back so the bath can fit snugly. Today the old faithful throne and basin came out and I fitted the thermostatic shower valve and plumbed … Read more